WK64152. 1. Scope. The proposed scope of this specification is to provide agencies, engineers and contractors with guidance about proper selection of geotextiles used to provide a separation, drainage and bond breaker interlayer for new concrete pavement and new concrete unbonded overlays

[email protected]
News Detail
  • Paving with the new P-501 Specification - ConcreteState

    Paving with the new P-501 Specification - ConcreteState

    Item P-501 Cement Concrete Pavement • Paragraph 501-2.3 Cementitious Materials—allowable Fly Ash CaO content increase from 13% to 15% • Paragraph 501-2.12 Material Acceptance—removed; unnecessary because each material has acceptance requirements in relevant sections. • Paragraph 501-2.12 Now is Bond Breaker • Choke stone #89—based

    Get Price
  • ENGINEERING BRIEF NO

    ENGINEERING BRIEF NO

    guidance and specifications for rubblization of existing Portland cement concrete pavements. This process has been employed in the pavement industry for many years with a recent initiative to expand into airfield applications. The in-place recycling process reduces the existing concrete pavement to a material comparable to an aggregate base course

    Get Price
  • 8600 Badger Breaker®

    8600 Badger Breaker®

    The 8600 Badger Breaker is a rubber-tired, self-propelled, guillotine-style concrete pavement breaker which carries an eight-foot wide, 12,000 pound hammer. The drop height of the hammer is electrically adjustable from 0 to 9 feet. PDF Downloads: 8600 BSHE Spec Sheet Hammer weight 12,000 pounds Hammer width 8 feet Strike bar width Replaceable, 1.5 inch wide, […]

    Get Price
  • HaryRock - Products - Rock Drill Dry

    HaryRock - Products - Rock Drill Dry

    HAVA Pavement Breaker is a medium duty breaker and is designed to operate most efficiently at 80 to 90 psi. HAVA breaker is designed to deliver the power and durability necessary for a variety of construction and plant maintenance applications such as breaking heavy concrete, reinforced concrete, frozen ground, boulders and pavements etc

    Get Price
  • SPECIAL SPECIFICATION 3123 Rubblizing Concrete

    SPECIAL SPECIFICATION 3123 Rubblizing Concrete

    2004 Specifications CSJ 0315-12-008, etc. SPECIAL SPECIFICATION 3123 Rubblizing Concrete Pavement 1. Description. Rubblize and compact concrete pavement. 2. Materials. Furnish materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of the proposed material sources and of changes to material

    Get Price
  • Interlocking Concrete Pavements — Guides Specifications | ICPI

    Interlocking Concrete Pavements — Guides Specifications | ICPI

    Interlocking Concrete Pavements Guest User May 12, 2020. Tile Pavers. Download Document. This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the minimum 2 3/8 in. (60 mm) required to conform to ASTM C 936. Read More

    Get Price
  • Rubblizing to rehabilitate existing pavements | Asphalt

    Rubblizing to rehabilitate existing pavements | Asphalt

    Get Price
  • Division 32 – Exterior Improvements

    Division 32 – Exterior Improvements

    D521 - Asphalt Pavement Trench Repair - Residential Streets 12/20/2012 . 32 01 18 . Temporary Asphalt Paving Repair : 12/20/2012 . 32 01 29 : Concrete Paving Repair . Edit document to meet project requirements. 06/19/2019 : D020 – Partial Panel Concrete Replacement 06/20/2019 . D521 - Trench Repair – Reinforced Concrete Pavement s 12/20

    Get Price
  • Chipping Hammer & Other Concrete Breaking Tools - The

    Chipping Hammer & Other Concrete Breaking Tools - The

    Pavement breakers weigh from 30 to 99 pounds. A good indication of a breaker's power is its weight. Pavement breakers weighing between 40 and 50 pounds are particularly useful for removing concrete for partial-depth pavement repair. The weight of these tools gives them the power needed to break up a few inches of concrete without being so heavy

    Get Price
  • 502 - PORTLAND CEMENT CONCRETE PAVEMENT

    502 - PORTLAND CEMENT CONCRETE PAVEMENT

    502 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) 500-23 SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Note: PCCP is considered NON-QC/QA when the bid item Quality Control Testing is not included in the contract. 502.1 DESCRIPTION Construct portland cement concrete pavement (PCCP) on a prepared subgrade or base course

    Get Price
  • Concrete Paving Selections

    Concrete Paving Selections

    TxDOT Specification – Allows 100 % coarse RCA – Waives soundness requirement ... Concrete pavements designed and constructed with predicted traffic – Some sections are insufficient for today’s traffic demand – Insufficient thickness has often resulted in pavement distresses ... CRCP system with CTB and bond breaker . 30 . Footer Text

    Get Price
  • UFGS 32 11 36.13 Lean Concrete Base Course

    UFGS 32 11 36.13 Lean Concrete Base Course

    portland cement concrete pavement. Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed

    Get Price
  • Pavement Manual: Rigid Pavement Design Process for CRCP

    Pavement Manual: Rigid Pavement Design Process for CRCP

    A bond breaker should always be used between concrete pavement and cement treated base. There have been several instances across Texas where excessive cracking and premature failures occurred when a concrete slab was placed directly on cement treated base

    Get Price
  • specificiation of concrete pavement breaker

    specificiation of concrete pavement breaker

    specificiation of concrete pavement breaker Breaker Specifications Antigo Construction Inc. Production rate of 400 sq. yds. (350 m2) per hour per breaker when pulverizing 10-inch (250 mm) thick continuously reinforced concrete pavement (CRCP) to the point where the rebar is completely free of the pavement and ready to be lifted out prior to pavement removal

    Get Price
  • Pavement Plans and Specifications | Caltrans

    Pavement Plans and Specifications | Caltrans

    Pavement Standard Plans and Specifications are the documents that implement the standards, policies, and best practices for pavements on California highways. They contain the standard requirements for bidding, constructing, and administering Caltrans contracts. Specifications include the Standard Specifications, Revised Standard Specifications

    Get Price
  • INDEX FOR SPECIFICATIONS FOR CONCRETE PAVEMENT

    INDEX FOR SPECIFICATIONS FOR CONCRETE PAVEMENT

    The Contractor shall supply and install anchoring grout capsules wherever existing concrete pavement or new concrete pavement must be drilled for the installation of load transfer dowels, deformed dowels, or deformed tie bars. The Contractor shall supply grout anchoring capsules in accordance with the Department’s Approved Products List

    Get Price
  • Break & Seat - Concrete Pavement Construction &

    Break & Seat - Concrete Pavement Construction &

    Mar 13, 2015 Break & Seat. The purpose of break & seat of jointed reinforced concrete pavement (JRCP) prior to overlaying it is to minimize the occurrence and severity of reflection cracks in the overlay caused by slab action by breaking the concrete slabs to reduce their effective length and then seating the broken slabs to reestablish support between the subbase and the slabs